Skip to main content

A governing scenario · Reviewed September 22, 2026

Andy Ellis
Beyond 100 days.

Ellis's clearest agenda concerns the local costs and secrecy of data-center development. A national translation must distinguish federal purchasing and disclosure powers from state utility rates and local land-use decisions.

A hypothetical presidency, not a claim of candidacy or an election forecast. Policy effects below are analytical possibilities conditional on authority, financing and delivery.

Person-specific focus · source-linked analysis

From a position to a governing program

The selected themes below come from this person’s series coverage. A source passage is separated from our analysis of implementation. The proposed federal pathway is an analytical translation, not a newly discovered promise. Unselected issues remain outside this review.

01 · Mixed executive and legislative authorities

Limits on data-center expansion

Series context · Limited or mixed evidence

This is the deepest layer of the Ellis record, and it fuses infrastructure, economics and civil liberties into one argument. His plan groups “data center developers, or AI, or surveillance companies” into a single object of regulation — an analytical move worth noting in itself: the data center is treated as the physical plant of an AI-and-surveillance economy whose costs (electricity, water, infrastructure) are socialized while its gains are private. The documented positions: nobody wants the facilities “except…

Read the full context: Technology, AI & Surveillance

What can start before the program is complete

Review federal land, contracts and subsidies; distinguish those levers from state utility powers and local siting.

What must change for the result to endure

If a broader restriction is proposed, specify legislation, exceptions, duration and an enforceable plan for existing contracts.

Drill down: failure modes and the test of success

Where it can stall: Demand may move to another jurisdiction without reducing total environmental effects; federal reach is not unlimited.

Evidence that would change the assessment: Demand relocation, household rates, water use, employment, investment foregone and effects of proposed alternatives. Compare outcomes with the pre-policy baseline and affected groups that did not receive the intervention; distinguish outside shocks from the policy’s contribution.

Before assigning a net winner: obtain the actual proposal, funding source, affected population, transition plan and independent cost estimate. An announcement, sponsorship or appropriation alone does not establish the final effect.

02 · Mixed executive and legislative authorities

Transparency and accountability

Series context · Limited or mixed evidence

The second-deepest layer of the record: the NDA prohibition is a named day-one instrument, and the secrecy critique — “dealmaking between government and industry has occurred in secret with iron-clad NDAs” — is the plan's diagnosis of how the industry captured both parties. The demand that policy come “from the people and the movements on the frontlines” is a governance doctrine as much as a campaign line. There is not enough public evidence to determine Andy Ellis's position on healthcare, housing, education,…

Read the full context: Government Transparency & Governance

What can start before the program is complete

Publish decision criteria and accessible records while protecting legitimate privacy and security interests.

What must change for the result to endure

Strengthen independent review, remedies and funding so disclosure produces correction rather than a document dump.

Drill down: failure modes and the test of success

Where it can stall: Weak data quality and lack of corrective authority can make reporting performative.

Evidence that would change the assessment: Response times, usable records, substantiated findings, corrective actions and independent access to underlying data. Compare outcomes with the pre-policy baseline and affected groups that did not receive the intervention; distinguish outside shocks from the policy’s contribution.

Before assigning a net winner: obtain the actual proposal, funding source, affected population, transition plan and independent cost estimate. An announcement, sponsorship or appropriation alone does not establish the final effect.

Beyond the opening hundred days

How Ellis’s agenda could develop

Choose the governing conditions. These scenarios test mechanisms and tradeoffs; they do not assign election odds, assume passage, or predict a numerical economic result.

Assume the specific proposal wins the votes and funding it requires; party control alone is insufficient.

Years 1–2

Use the first two years to enact the specified law, finish required procedures and start delivery.

Years 3–4

By years 3–4, evaluate actual use, costs and unintended effects; amend or stop ineffective components.

Years 5–10

In years 5–10, assess whether later governments retain the law, financing and operating capacity. This horizon does not assume reelection.

Chart 4 · From agenda to durable governance
ThemeWhat this scenario requiresWhat can interrupt it
Limits on data-center expansionIf a broader restriction is proposed, specify legislation, exceptions, duration and an enforceable plan for existing contracts.Demand may move to another jurisdiction without reducing total environmental effects; federal reach is not unlimited.
Transparency and accountabilityStrengthen independent review, remedies and funding so disclosure produces correction rather than a document dump.Weak data quality and lack of corrective authority can make reporting performative.

Conditional winners and losers

Who could gain—and who could bear costs

Chart 5 · Qualitative exposure map. These groups can overlap: the same person can gain as a worker and pay more as a consumer or taxpayer. No net ranking is possible without specified legislation, financing and independent estimates.

The channels below assume the relevant policy is enacted and delivered as designed. Benefits remain conditional on implementation.

Limits on data-center expansion

Potential beneficiaries

Communities facing water, power or noise pressures could gain time and bargaining power if growth is slowed or conditions tightened.

Potential costs and risks

Construction workers, suppliers and compute users could face lost work, higher costs or relocation of investment.

Check the result: Demand relocation, household rates, water use, employment, investment foregone and effects of proposed alternatives.

Transparency and accountability

Potential beneficiaries

Voters, service users and responsible firms could gain information and more contestable decisions.

Potential costs and risks

Agencies face compliance work; indiscriminate disclosure can expose personal data or compromise legitimate operations.

Check the result: Response times, usable records, substantiated findings, corrective actions and independent access to underlying data.

Keep the source trail intact

Original articles and citations

The original reporting and analysis remain unchanged. Citations below are retained from those articles and are not all independently revalidated in this extension. Consult the linked passage, date and underlying document before treating a proposal or officeholding assertion as established fact.

All 1 series article

View 10 preserved external citations
  1. Andy Ellis For Governor 2026 — Data Centers: the full data center policy (STOP THE DATA CENTERS plan) (article context)
  2. Andy Ellis For Governor 2026 — campaign website: About, Issues, Priorities, Platform (article context)
  3. Ellis/Andrews Campaign Announces Data Center Policy — press release, August 25, 2026 (Andy Ellis, [email protected]) (article context)
  4. Andy Ellis & Owen Silverman Andrews for Maryland (YouTube) — Andy Answers Questions From the 2025 Maryland Green Party Assembly (July 12, 2025) (article context)
  5. Maryland Green Party — state party page and 25th Annual Assembly (June 14, 2025) (article context)
  6. Green Party of the United States — national party page (article context)
  7. Ballotpedia — Maryland gubernatorial election, 2026 (article context)
  8. Maryland Governor's Office / Governor Wes Moore — May 2024 "Supercharge the data center industry" proclamation (referenced in the Ellis plan) (article context)
  9. Maryland Department of the Environment (MDE) — enforcement-audit target named in the Ellis day-one executive order (article context)
  10. Hero photo — m01229, Wikimedia Commons (article context)

Framework for the new analysis

The framework sources explain institutions and constraints; they do not support a numerical forecast or endorse these scenarios. Read the full method ↗